The project involved the construction of a new Mechanical Transport Filling Installation (MTFI) at RAF Lossiemouth, alongside the decommissioning of two existing sites.
All civil, mechanical, and electrical engineering works were delivered in-house by Industrial Services and Carmichael + Baxter Groundworks. The only exception was the installation of the new firefighting system, which was subcontracted to Ritmac of Glasgow and managed by our team.
The successful delivery of this project was made possible through the support of our key suppliers—TB Tanks, PFS Fueltec, Hytek/Pumptronics, and Gilbarco Veeder-Root—to whom we extend our sincere thanks for their continued collaboration and commitment.
Industrial Services delivered an on-budget, on-time service to MOD Lossiemouth via a collaborative team effort, Resulting in an award-winning development.